Profile Picture

Scheduling RightEdge runs

Posted By suzhe 4 Years Ago
Message
Posted Wednesday March 13 2013
Hi,

I have a trading system that needs updated symbol data. I am wondering if there is any way to schedule the following tasks:

1. update the symbol data (currently I'm hitting the "Update" button in the Watchlist panel)
2. run the trading system simulation (equivalent of System --> Run Simulation)
3. email myself and others the run results based on some parameters in the results -- anyway to send an email from RightEdge code?

Thank you,

Zhendi
Posted Wednesday March 13 2013
1. update the symbol data (currently I'm hitting the "Update" button in the Watchlist panel)
2. run the trading system simulation (equivalent of System --> Run Simulation)

For those two see Automating Right edge in the help manual.

3. email myself and others the run results based on some parameters in the results -- anyway to send an email from RightEdge code?

You can put code in the shutdown method to email you/others any results/trades you want.

I do exactly as the above each day.




Similar Topics


Reading This Topic


2005-2017 © RightEdge Systems